Emerald Shire
Stock Route Management Plan
2004 to 2008
Developed
Covering the
Shire
of Emerald

Contents
1.2.1 Emerald Shire Working Groups
1.4 Classification of the Stock Routes
1.5 Statistics and Facts about SRN
1.5.1 Statistics and Facts about SRN within Emerald Shire
2.1.1 Relevance for SRN management
2.1.3 Network integrity policies
2.1.4 Network integrity issues
2.1.5 Network integrity strategies and actions to address issues and targets
2.2.1 Relevance for SRN management
2.2.3 Grazing management policy
2.2.4 Grazing Management Issues
2.2.5 Grazing Management Strategies and Actions
2.3 Significant area management
2.3.2 Vegetation Management policies
2.3.3 Significant Area Management Strategies and Actions
2.3.4 Vegetation Management Issues
2.4.2 Risk and safety management strategies and actions
2.5.2 Construction and maintenance policy
2.5.3 Infrastructure management strategies and actions
2.5.4 Infrastructure management issues
2.6 Water agreements management
2.6.2 Water agreements management policies
2.6.3 Water agreements management strategies and actions
2.6.4 Water agreements management issues
2.7 Pests and Disease Management
2.7.2 Pests and diseases management policies
2.7.3 Pests and diseases management strategies and actions
2.7.4 Pests and diseases management issues
2.8 Permitting travel and agistment
2.8.2 Permitting travel and agistment policies
2.8.3 Permitting travel and agistment strategies and actions to address
issues
2.8.4 Permitting travel and agistment issues
2.9.2 Permits to Occupy policies
2.9.3 Permit to Occupy issues.
2.9.4 Permitting travel and agistment strategies and actions to address
issues
2.10.4 Compliance strategies and actions to address issues
4 Monitoring and
evaluating the plan
6.1 Appendix 1 – Inventory of Water facilities
6.1.1 Emerald Shire Water Facility Inventory
6.2 Appendix 2 – Travelling stock usage
6.2.1 Emerald Shire Travelling Stock Numbers
6.3 Appendix 3 - Agistment Usage
6.3.1 Emerald Shire Agistment Usage on Stock Routes
6.4 Appendix 4 - Stock Route Classifications
6.4.1 Emerald Shire Stock
Route Classifications
This plan has been developed to assist in managing the Emerald Shire Stock Route Network as well as maintaining the integrity of the valuable Central Highlands Stock Route Network.
Most Stock Routes and Watering Facilities throughout the Emerald Shire have been upgraded through an extensive Capital Works Program during the late 90’s to enhance the integrity of the network.
The Stock Route Network within the Emerald Shire is a valuable asset. The network is utilised for moving large herds of cattle on foot from shire to shire and provides a valuable feed asset during times of drought. The Network also provides home to rare and endangered Fauna and Flora and presents Cultural Heritage Values.
The Emerald Stock Route Network consists of
approximately 585 kilometres of stock routes.
A stock route is defined under the Land Protection (
A reserve for travelling stock is
also defined in the Act and these reserves are set aside under the Land Act
1994 for a community purpose that allows for usage for travelling
stock.
The Emerald Shire Stock Route
Management Plan has been developed in response to the Land Protection (
The stakeholder representatives
of the Emerald Shire Stock Route Management Working Group, outlined in Table 1,
participated and provided comments in the preparation of the
Table 1 Stakeholders Represented on the Stock Route Management Working Group for Emerald Shire
|
Position |
Organisation |
|
Chief
Executive Officers Mayors Councillors Stock
Route Supervisors Landholders |
Emerald
Shire Rural Services Committee |
|
Land
Protection Officer |
Department
of Natural Resources and Mines (NR&M) |
|
Stock
Inspector |
Department
of Primary Industries (DPI) |
|
Engineer
in charge Environmental
Officer |
Department
of Main Roads (DMR) |
|
Land
Managers / Landholders / Drovers |
Emerald
Shire |
|
Industry
Representatives |
AgForce Cotton
Food
and Fibre Qld
Rail Ergon
Energy SunWater |
|
Representatives |
Central
Highlands Natural Resource Management Group |
In the process of preparing the plan the working group engaged with the local community to capture the main interests of stakeholders. This involved:
· Posting a notice in the local Central Highlands newspaper CQ News, on Friday 27 August 2004 to announce the release of the draft Emerald Shire Stock Route Management Plan, and
· Called for comments over a six-week period.
The draft plan was made available
to the public, at the Emerald Shire Council office, for comment from
---------- submissions were received and considered by the working groups. Several of the issues raised resulted in changes to the draft plan, while other issues were decided to be outside the scope of the Emerald Shire SRNMP. A summary of the submission issues raised and the working groups responses are available for viewing from the Emerald Shire Council Office.
The purpose of this plan is to provide a useable framework to assist in improving the management of the SRN so that the impacts of stock on the resources, users and values of the SRN are minimised, whilst minimising the impacts from other users of the network on travelling stock. SRN management does not encompass the overall management of the road corridors where the stock routes are located. It is simply the management of impacts from stock and impacts to stock.
Clear and achievable targets and goals, have been set out in the plan for sustainable management and use of the SRN within the Emerald Shire.
Implementation of the plan will lead to improvements in services to stakeholders, greater accountability of the Council and more efficient use of available resources. Ultimately, this plan will play a vital role in protecting the production and conservation values of the Emerald Shire Stock Route Network.
The plan will operate as a
practical extension of the visionary statements and goals set out in the
Queensland SRN Management Strategy and the Principles for SRN Management,
provided for in the Land Protection (
For each component there is a management goal; the indicators and targets for achieving the goals; council policies for on-going management; the issues for management, and the strategies and actions to address the issues.
This plan covers a stock route network of 585 km of stock routes. These routes are classified as primary, secondary, minor or inactive routes based on the level of use of the route by travelling stock and have been declared under the Land Protection (Pest And Stock Route Management) 2002. The classifications have been derived from statistics obtained from the issue of Stock Route Permits between 1988 and 1997 (Table 2).
Emerald shire has separate classifications for developing operational priorities. The classifications have been determined through frequency of usage and also infrastructure on the routes. They are classified as Major, Minor and Unused (see attachment for individual route classifications for the SRN)
Table 2 Classification of stock routes as set under the Act
|
Classification |
Cattle Equivalents Per
Annum (6 sheep = 1 cow) |
|
Primary |
> 9000 Cattle |
|
Secondary |
3000 –9000 Cattle |
|
Minor |
< 3000 Cattle |
|
Inactive |
Local & unrecorded
movements |
Maintaining the SRN’s integrity will contribute towards achieving two legislative principles for SRN management as set out in the Act: “management” and “planning”. That is, by managing the Stock Routes to “ensure they remain available for public use”, “managing and improving the network’s natural resources and travelling stock facilities for use” and planning so that management is “consistent at local, regional and State levels” the overall integrity of the part of the state network within the Central Highlands including Emerald Shire will be not only be maintained, but enhanced.
In addition, this plan’s intentions for network integrity also contribute towards implementing the Queensland Stock Route Network Management Strategy by providing for strategic direction and coordination, as well as network enhancement and operational management. That is, management is planned, resourced, and retained/acquired to enhance and maintain the integrity of stock routes and reserves with the Central Highlands including Emerald Shire.
The SRN’s integrity as a State
corridor is maintained and enhanced so that unimpeded travel can occur through
Emerald Shire and the Central Highlands
· The Emerald Shire have agreed to develop a Stock Route Management Plan in consistence with other adjoining Central Highlands shires, as Emerald Shire recognises the importance of ensuring the integrity and consistent management of the Stock Route Network across shire boundaries.
· Investigate the removal of the stock route declaration of historically unused Stock Routes.
· Investigate the disposal of stock route facilities to other parties on historically unused stock routes.
· Council will determine, through recommendations made by the stock route supervisor, the types and location of impediments to travelling stock on the network (eg illegal fences, illegal farming etc) and order removal of such impediments through notices to landholders, incorporating tasks into Council Staff work plans.
· Emerald Shire will identify additional or alternative routes and reserves that may be suitable for travel or agistment (based on advice from the Stock Route Supervisors) and apply to the State for addition to the stock route network
· Construction of new water facilities to enable stock to achieve a 10 km per day travelling rate on routes that are frequently used and or have the potential for sustained usage (eg a route may not be used because it has no water facilities).
For the Emerald Shire to meet the goals and targets set for network integrity, and to be able to manage the SRN in accordance with the network integrity policies the following issues need to be addressed:
1. Inconsistent policies across shires including shires outside the Central Highlands
2. Facilities and Stock Routes that need to be reviewed for either disposal or upgrade.
|
Strategy |
Action |
Priority |
|
By Dec 2004 all Central Highlands Shires to adopt a plan and it’s policies. |
1. Resolve policy issues at the Shire Rural Services Committee Meetings |
High |
|
To rationalise the current network in order to maintain the infrastructure for future usage on used routes. |
1. Identify Infrastructure and Stock Routes that are required for current and future usage and prepare a map of these. 2. Emerald Shire prepare a submission along with a map of infrastructure and stock routes to be either disposed of or removed based on current and future requirements to NRM&E for consideration. |
High |
|
Network integrity indicators |
Targets |
|
Adjoining Central Highlands Councils working together to manage the Stock Route Network |
All Central Highlands Shire
Councils’, Stock Route Network policies are consistent |
|
All Emerald Shire watering facilities in good working order |
SUBJECT
TO FUNDING AVAILABILITY |
|
New Emerald Shire watering facilities established on routes that are frequently used or ones that have the potential for high usage. |
Establish 1 new facility Emerald Shire by Dec 2006 SUBJECT TO FUNDING AVAILABILITY |
The Emerald Shire believes that sustainable grazing management will directly contribute to the “management” principle of stock route network management as set out in the Act. That is, pasture availability, cover, and pasture composition will contribute towards the legislative principle in which the stock route network is managed “to maintain and improve the network’s natural resources”. Maintaining sustainable grazing pressure will ensure healthy pasture species and sufficient ground cover therefore enabling the network “to remain available for public use” now and in the future.
This plan’s objectives for grazing management also contributes to implementing the State SRN Strategy and the Central Highlands Natural Resource Management Plan in that it aims to achieve sustainable management. That is, it implements best management practices for on-ground management and provides for training and education to achieve sustainable use.
1. That travelling stock, and/or agisted stock
are managed ensuring that the grazing resources are sustainably managed and
available for
future use.
2. To
ensure the pasture and soil within the SRN is kept in optimal condition all year
round to maximise moisture infiltration,
ground cover, and
useful pasture composition.
The Grazing Management policy as set out below outlines the areas that the Emerald Shire sees as important management issues that require strategic management tools in order to achieve sustainable grazing of stock routes and reserves for travelling stock within the Emerald Shire. The Emerald Shire Stock Route Management Working Group is committed to implementing this policy through its administrative and work-planning processes and through sound decision-making.
Ø Maintain a minimum 30% Ground Cover across all stock routes and relevant land. (Ground Cover Standards are attached)
Ø If less than 30% don’t allow agistment.
Ø If less than 30% impose special conditions to increase rate of travel or seek alternative route.
Ø
In the event of a dispute over pasture and
forage condition local Department of Primary Industries and Fisheries staff
(acting independently to local shire) to assess the situation and provide
recommendations (Emerald Shire has an agreement with DPI&F Staff to assist
in this process) if necessary.
Ø Areas assessed through regular monitoring to have more forage (pasture) than is required for travelling stock will be managed in this order of priority: short-term agistment under a permit (where there is interest), burning (when for environmental/safety reasons) or bailing (through a call for expressions of interest).
Ø Landholders adjoining a stock route wishing to burn a stock route must seek permission of Stock Route Supervisor prior to submitting a burning permit application to fire warden. (Shire has an agreement with QRFS in relation to this.)
Ø The Stock Route Supervisor will take land type, land condition and ground cover (“Stock take” – Short term) into account when making decisions regarding stock and other land management issues, including considering carrying capacities of land to make decisions regarding travel, agistment (under permit) or agistment/occupation under a permit to occupy.
Ø The stock route supervisors will carry out land condition monitoring (Grazing Land Management Monitoring – long term) to determine carrying capacities and estimated grazing days for the SRN, which will feed into permit assessment and other management decision-making processes.
Ø The Emerald Shire council continue to work in partnership with Dep’t of Main Roads to ensure that the management of users of the state controlled road network is consistent with the policies of this plan.
Ø Users to be issued with a Spray Drift Notification Form in areas that are of concern. Notifying users that there is a potential that certain areas of routes may have chemical residues during certain periods due to the potential for drift from neighbouring farms i.e. cotton, horticulture, grain. It may not necessarily mean that there has been drift it is simply to notify users that there are certain crops neighbouring the SRN
Ø All users to be notified via map of areas where 1080 baiting has occurred by adjoining landholders to the Stock Route Network
Ø Baiting should not occur on the SRN without the express permission of the Stock Route Supervisor, if baiting allowed signage to be erected as per the 1080 indemnity form.
For the Emerald Shire to meet the goals and targets set for grazing management, and to be able to manage the SRN in accordance with the grazing management policies the following issues need to be addressed:
|
Strategy |
Action |
Priority |
|
Increase grazing management skills of the Stock Route Supervisors |
Stock Route Supervisor to attend a ‘Stock take’ training program provided by the Department of Primary Industries. |
Medium |
|
Stock
Route Supervisor to attend an EDGE Network ™ GLM |
Medium |
|
|
Enhance compliance skills of Stock Route Supervisors and other relevant officers |
Stock Route Supervisors and other relevant officers to attend retraining of the Land Protection Act and Compliance. |
High |
|
Continue Coordination between Main Roads and Emerald Shire Councils |
Continue annual meetings with Main Roads and Emerald Shire Stock Route Supervisors discussing Travelling Stock, Impediments, Auxiliary Works Permits etc. |
High |
|
Implement a fire management plan by June 2005 |
Stock Route Supervisors to develop, document and implement an annual fire management plan for the stock route network in consultation with Qld Rural Fire Service. |
High |
|
Establishment of a mediation network to deal with disputes by June 2005 |
Identify key people to form a mediation group and establish a mediation group to address disputes where there is no remedy in the legislation. |
High |
|
To ensure no off target spray drift. |
Stock Route Supervisors to conduct informal education program with landholders neighbouring the SRN on drift and residual effects in terms of livestock slaughter interval issues |
Medium |
|
Grazing management
indicators |
Targets |
|
Pasture maintained in a healthy state all year round |
Above 30% Cover all year round |
|
Conditions of Permits adhered – no action required |
100% of permit conditions adhered by all users by Dec 2005 |
The implementation policies as outlined for significant area management will assist in managing key biodiversity areas, Threatened Species and Communities. They will also assist in addressing targets under the Central Highlands Natural Resource Management Plan. The Emerald Shire Stock Route Network represents a significant vegetation and wildlife corridor.
To protect cultural values, 'Endangered'
and 'Of Concern' ecosystems within the
The Emerald Shire recognise numerous significant areas within its network, ranging from cultural heritage sites (indigenous and historic) to areas that hold significant environmental value (including areas of significant biodiversity, threatened species and communities). These policies aim to manage the SRN to ensure that the values of these significant areas do not decline.
· Culturally significant areas must, as a condition of their permit, be fenced off from Stock within 10 metres of a site by the use of temporary electric tape fences (if no permanent fence present), if it is deemed necessary.
· All users of the Stock Route Network to receive a copy of a map with Culturally Significant areas marked on them.
·
Conditions may be applied to all users of the
stock route network if they are likely to come in contact with a culturally
significant area.
|
Strategy |
Action |
Priority |
|
To inform all users of the SRN of the Biodiversity and Cultural Values of the SRN, so that there activities do not adversely impact these values. |
Emerald Shire to liase with EPA and NRM&E to supply all Stock Route Supervisors with an up to date digital map either A3 or A4 of Vegetation Communities and Cultural Heritage areas within the Emerald Shire by Dec 2004 |
Medium |
For the Emerald Shire to meet the goals and targets set for vegetation management, and to be able to manage the SRN in accordance with the vegetation management policies the following issues need to be addressed:
|
Vegetation management and
Cultural Heritage indicators |
Targets |
|
The existing ecosystems within the SRN do not decline but improve. |
1. 50% reduction in Priority Pest Plants species within the SRN by June 2007 2. Above 30% ground cover to be maintained across the SRN |
|
Nil near misses or accidents recorded due to unsafe thickening either through visual impediments or stock not being able to pass through the area safely. |
1. Identify and address hazards by June 2006 |
The SRN within Emerald Shire
remains a safe environment for the people and stock permitted to use it, and the
use of the SRN does not cause harm to other people and equipment that may use
the road corridor for other purposes.
· The Stock Route Supervisor to identify any traffic safety issues and produce a map of the shire highlighting these issues.
· All users of the Stock Route Network to receive a copy of the stock route network map with identified possible safety issues i.e. squeeze points, range areas etc.
· The Stock Route Supervisors will conduct regular safety assessments of all stock route watering facilities and holding yards. Any major issues to be raised at the Emerald Shire Rural Services Committee Meeting with the Stock Route Supervisors recommending appropriate action.
· For vegetation thickening issues please refer to the vegetation management policy – 2.3.5
· Implement burning regime to reduce fuel loads
· Stock Route Supervisors to ensure that safety issues are included on the permit
· Any breaches of permit conditions by users to be investigated with action taken if necessary
|
Strategy |
Action |
Priority |
|
Raise awareness to the users of the SRN about the safety hazards to them, their stock and to others |
1. Notify on the permit and also via map (if required) of the potential hazards and requirements by the user to ensure the safety for their use and also others that may be using the road network. 2. Ensure that all users are fully aware of the potential dangers with travelling stock on the SRN when coupled with a road network. (through verbal communication). 3. The Project Officer and Stock Route Supervisors develop a Stock Route User Safety Guide to ensure users are fully aware of the potential hazards their activity may cause to other users or hazards that my impact on their activity. |
High |
|
Risk and safety management
indicators |
Targets |
|
Number of Hazards affecting the Stock Route Network |
50% Reduction of Hazards across the SRN by Dec 2006 |
Squeeze
points Old
Quarries, Borrow Pits
Fencing
Old
rubbish dumps, car bodies etc
Fuel Loads (pasture) Traffic
Vegetation Thickening Potential
Blind Spots
Range areas Signage
Holding Yards Water Facilities
Poisonous Plants
· Stock Route Supervisors to identify routes that have consistent use and need more watering points within 10 km range.
· Stock Route Supervisors to identify routes that have the potential for consistent usage but require more watering points.
· Stock Route Supervisor to identify areas where holding yards are required and make recommendations to council on priorities for construction.
· Continue to maintain and upgrade infrastructure on reserves including fences, watering facilities and pest management.
· The stock route supervisor will assess the condition and fill out the annual assessment sheet (see attachment for current status) of all stock route facilities on an annual basis, making recommendations on priorities to Council for inclusion in the annual budget.
· Council will apply to State for capital works funding for identified annual construction and maintenance priorities.
·
Construct new water facilities on routes identified
as consistent usage that are not 10 km’s apart.
|
Strategy |
Action |
Priority |
|
To maintain existing facility network and establish new facilities in areas required to further improve the integrity of the network |
1. Stock Route Supervisors to make recommendations to Council on new facilities and the priorities to be established – annually. 2. Emerald Rural Services Committee to seek State funding to assist in establishing new facilities – annually. 3. All existing facilities to be maintained in good to fair condition by Dec 2005 SUBJECT
TO AVAILABLE FUNDING |
Medium |
|
Ensure Compliance of Water agreements |
4. New water agreements in place by 2005 with compliance of conditions monitored by stock route supervisors |
High |
For Emerald Shire to meet the goals and targets set for infrastructure management, and to be able to manage the SRN in accordance with the infrastructure management policies the following issues need to be addressed:
1. Fencing of Holding Yards in poor condition
2. Lack of available funding for new and existing infrastructure
|
Infrastructure management
indicators |
Targets |
|
Facilities are maintained in good operating condition |
100% of facilities in fair – good condition on routes identified for future and current use by Dec 2005 |
|
Distance between water facilities on consistently used routes |
10 km’s between water points for consistently used routes by June 2008 |
To ensure that the water needs
of travelling stock are met and that agreement holders with rights to the water
are not negatively impacted upon. To
ensure that the infrastructure is maintained in a satisfactory state at all
times.
· Existing water agreements to be reviewed and if required terminated giving the agreement holders sufficient time to arrange alternative supply. Agreements to be terminated if conditions on the agreement have not been met.
· No new water agreements to be entered into without full consultation with all parties involved i.e. Stock Route Supervisors, Council, Landholder, Department of Natural Resources Mines & Energy reps etc.
|
Strategy |
Action |
Priority |
|
Ensure a fair and equitable process for assessing water agreements |
Document the agreed process for assessing water agreement applications and ensure all stakeholders are aware of the process |
High |
For Emerald Shire to meet the goal set for infrastructure management, and to be able to manage the SRN in accordance with the water agreement management policies the following issues need to be addressed:
1. Agreement holders not carrying out general maintenance.
2. Inconsistency of Water Agreements
3. Users of the SRN refused access to water
|
Water agreements management
indicators |
Targets |
|
Consistent Water Agreements |
100% of Water Agreements to be reviewed and consistent by June 2005 |
·
Encourage all stock owners / drovers / machinery
operators to take reasonable steps to ensure their stock or machinery are clean
from pests, disease and weed seeds on entering and leaving the SRN.
·
Ensure that all users of the SRN understand
their obligations to prevent the spread of weeds through contaminated vehicles,
machinery and their loads as required under the Land Protection (
·
Require all stock and other products entering
the SRN to be declared weed free, or to take practical measures to ensure that
they are weed free.
·
Ensure all vehicles entering SRN are washed down
prior to entering Emerald Shire SRN, and an inspection to be carried out if
necessary issuing an inspection report i.e. coming from known GRT areas, Going into
Jericho Shire from parthenium areas in the Central Highlands. Encourage users to wash down vehicles on
leaving the SRN.
·
Carry out routine pest animal control programs
on reserves to minimise pest animal impacts
·
Carry
out declared pest plant control as per annual works program
·
Ensure
all stock are tick free entering and leaving the SRN.
·
Ensure users hold cattle for 5 days
prior to entry to Jericho Shire to ensure weed seed free prior to entry on SRN
within Jericho Shire, Bungil, Taroom, Tambo, Murweh, Duaringa.
|
Strategy |
Action |
Priority |
|
To continue to keep Neighbouring Shires and Jericho Shire relatively Parthenium Weed Free |
1.
Ensure conditions are placed on Permit to ensure
users hold stock for 5 days prior to entering 2. Ensure users with vehicles and machinery have taken reasonable steps to minimise weed seed spread i.e. wash down prior to entry to Jericho Shire and Neighbouring Shires Stock Routes (Bungil, Taroom, Duaringa, Tambo). 3. Wash down Facilities and holding paddocks to be included on maps to be included with permit. |
High |
|
To ensure GRT Free Status for Emerald Shire |
1. Stock Route Supervisors to monitor SRN for new weed incursions and follow Rapid Response Policy if required. 2. Ensure users abide by the policies and conditions set out on the permit. |
High |
|
To ensure that travelling stock do not carry ticks into tick free areas |
1.
Include Tick Line on 2. Follow DPI Guidelines and include as conditions on Permit. |
Medium |
|
Minimise the spread of declared pest plants on the SRN. |
1. Stock Route Supervisors require a copy of the Weed Hygiene Declarations for any stock, machinery, vehicle etc entering the Central Highlands SRN. 2. Awareness material provided to SRN users on: : Their obligations to minimise weed spread and : The need to minimise weed spread |
Medium |
For the Emerald Shire to meet the goals and targets set for pest and disease management, and to be able to manage the SRN in accordance with the pest and disease management policies the following issues need to be addressed:
1.
Spread of Parthenium weed into
2. Maintain GRT free Status of the Emerald Shire
3. Vehicle and Machinery Movements in and out of dirty areas.
|
Pests and diseases
management indicators |
Targets |
|
Percentage of SRN area covered by declared pest plants |
50% reduction in priority declared pest species by June 2007 |
To carry out the process of assessing
applications for permits to travel and/or agist stock on the SRN that ensures
that the resources of SRN are sustained and to provide successful applicants
with a clear understanding of the specific requirements of users of the SRN.
Approving permits Policy
·
Stock Route Supervisors to refer DNRM&E
Guidelines (attached) when approving and issuing permits for travelling stock
and agistment permits.
·
Stock Route Supervisors to refer to Dep’t of Main
Roads and Qld Rail Guidelines and include conditions on permits if necessary to
comply with these Guidelines.
·
Prior to approval of the permit if destination
is outside the Emerald shire, all shires stock route supervisors where stock
are to travel through arrange a meeting altogether with the applicant; to
explain expectations and policies of the users prior to travelling.
Permit monitoring Policy
Agistment approval Policy
|
Strategy |
Action |
Priority |
|
To provide fair and equal access to the SRN whilst taking into consideration the condition of the SRN. |
|
High |
For the Emerald Shire to meet the goal set for permitting travel and agistment, and to be able to manage the SRN in accordance with the permitting travel and agistment policies the following issues need to be addressed:
1. Local ratepayers want priority to agist on the SRN.
2. Land Condition (erosion, weeds)
3. Pasture Condition (poor cover, undesirable species, poor pasture composition)
4. Safety
5. Vegetation Management and Cultural Heritage
6. Infrastructure – Holding Paddocks, Water availability
7. Road Works
To ensure the permittees adhere to the conditions set out e.g. land and forage condition, fencing, and pest management. To ensure that the SRN remains an unimpeded thoroughfare.
For the Emerald Shire to meet the goal, set for Permits to Occupy, and to be able to manage the SRN in accordance with the Permit to Occupy policies the following issues need to be addressed:
1. Fence lines
2. Gateways
3. Pasture Cover
4. Pasture Quantity
5.
6. Permittees refusing entry to SRN Users on the Stock Route, Watering Facility, Holding Yard, Reserve.
7. Road Safety
PLEASE NOTE – These issues need to be addressed in the Standard Conditions set for permits.
|
Strategy |
Action |
Priority |
|
To provide fair and equal access to the SRN whilst taking into consideration the condition of the SRN. |
|
High |
To develop a fair and
equitable compliance process to assist in maintaining a sustainable
· Stock Route Supervisors to identify potential breaches by users, investigate and make recommendations on mode of action for CEO or delegated authority to act.
· An inspection program to be carried out periodically on routes consistently used under Permits to Occupy, and Water Agreements and report to be compiled and provided to Council.
· Ensure consistent compliance policies across shires.
For the Emerald Shire to meet the goal and targets set for compliance, and to be able to manage the SRN in accordance with the compliance policies the following issues need to be addressed:
1. Following through on SRN Policies
2. Training in Compliance
|
Strategy |
Action |
Priority |
|
Develop enforcement partnerships with other Central Highlands shire members |
1. Conduct meetings between Stock Route Supervisors regularly to discuss compliance issues. 2. Discuss compliance issues at Central Highlands NRM Group meetings. |
Medium |
|
Enhance Compliance Skills of Stock Route Supervisors and relevant officers |
1. Stock Route Supervisors and other relevant officers to attend retraining of the Land Protection Act and Compliance. |
Medium |
The Councillors of the Emerald shire (including CEO, Mayor, councillors, Stock Route Supervisor) recognise the value and importance of the implementation of this plan and the impacts it will have on the Emerald Shire’s valuable stock route network.
Performance indicators have been included with each of the management components of the plan. These indicators will be monitored prior to the annual review period of the plan, and the achievement of targets will be assessed.
The Emerald Shire Council Rural
Services Committee agree to meet during the period
from April 1 to
The Central Highlands NRM Group will re-establish a working group at the end of the 2007/2008 financial year to prepare the next Emerald SRN Management Plan 2008 – 2012.
|
Abbreviation |
Meaning |
|
DMR |
The Department of Main Roads |
|
DPI |
The Department of Primary Industries |
|
EPA |
Environment Protection Agency |
|
NRM&E |
The Department of Natural Resources, Mines and Energy |
|
QPWS |
|
|
SRN |
Stock Route Network |
|
SRMP |
Stock Route Management Plan |
|
The Act |
The Land Protection ( |
|
SRS |
Stock Route Supervisors |
Emerald Shire Stock Route Management Working Group
|
WATER FACILITY NAME |
FACILITY ID |
ROUTE NUMBER FACILITY
ON |
TYPE OF FACILITY |
INSTALL DATE |
ESTIMATED REPLACEMENT
DATE |
WATER AGREEMENT HELD AND
WHO WITH IF AVAILABLE AND EXPIRY DATE |
CONDITION ASSESSMENT As at ( |
|
|
W2507 |
S406 |
Sub Artesian |
1970 |
2020 |
|
Good |
|
Emerald Saleyards |
|
S406 |
Town Supply |
|
|
|
Good |
|
|
W2818 |
S406 |
Channel off take |
2002 |
2030 |
|
Good |
|
Fairbairn Dam |
|
S406 |
|
|
|
|
Good |
|
Gindie |
W1510 |
S406 |
Excavated Tank |
1960 |
2030 |
|
Good |
|
Kammel |
W0229 |
S406 |
Sub Artesian |
1936 |
2020 |
|
Good |
|
Fernless |
W1509 |
S406 |
Sub Artesian |
2003 |
2040 |
|
Good |
|
Galgathaa |
W2205 |
M412 |
Excavated Tank |
1960 |
2030 |
|
Good |
|
Gindie |
W1510 |
M861 |
Excavated Tank |
1960 |
2030 |
|
Good |
|
Saleyards Paddock |
|
M362 |
Gully Dam |
|
|
|
Good |
|
|
|
M362 |
Sub Artesian |
|
2030 |
|
Fair |
|
Withersfield |
W2394 |
M362 |
Sub Artesian |
1966 |
2020 |
J Graham |
Good |
|
STOCK ROUTE ID |
1998/1999 |
1999/2000 |
2000/2001 |
2001/2002 |
2002/2003 |
JAN 2003 to DEC 2003 |
||||||
|
|
Number of Permits |
Cattle Numbers (Adult) |
Number of Permits |
Cattle Numbers (Adult) |
Number of Permits |
Cattle Numbers (Adult) |
Number of Permits |
Cattle Numbers (Adult) |
Number of Permits |
Cattle Numbers (Adult) |
Number of Permits |
Cattle Numbers (Adult) |
|
S406 |
1 |
900 |
1 |
580 |
1 |
1200 |
3 |
3530 |
7 |
6173 |
6 |
5251 |
|
M362 |
3 |
2740 |
1 |
135 |
1 |
1500 |
- |
- |
2 |
2400 |
3 |
2703 |
|
M442 |
2 |
2200 |
2 |
2500 |
2 |
2500 |
2 |
2500 |
2 |
2800 |
|
|
|
M413 |
|
|
|
|
|
|
|
|
|
|
|
|
|
M861 |
1 |
1200 |
|
|
|
| ||||||